Fire rebuild contractor in Altadena. Check your lot free.
Rebuilding your home in Altadena, maybe with an ADU? Enter your address for a free lot report. Our in-house team handles plans, LA County permits and construction.
Final price depends on your lot, size and finishes.
Building in Los Angeles since 2006
Free, no sign-up. Enter an LA County address or parcel number (APN).
A1Site plan
ProjectSample lot until you search
Can you rebuild bigger, or add an ADU? Check your lot free.
Check your Altadena address for lot size, zoning, ADU options and fire map flags. Site and County review confirm what you can build.
Before you interview a rebuild contractor, enter your Altadena address or parcel number. The free report shows your lot size, zoning and recorded home size, which ADU types are likely, and fire, hillside and historic flags.
Beaver rebuilds homes and ADUs in Altadena after the Eaton Fire, from the cleared lot to move-in.

General notes: your report includes
- Address & city. Your parcel and the city or county that handles permits.
- Lot & existing home. Lot square footage and recorded home size, where available.
- Zoning & ADU potential. Available zoning records and ADU options worth exploring.
- Size & possible placement. Size guidance, setbacks and a sample layout where maps allow.
- Property considerations. Available fire, flood, hillside, coastal and historic map flags.
- Your next steps. Starting-price examples and items to review with Beaver.
Coverage varies by city and available records. We confirm missing details and your property’s maximum buildable size through site and city review.
A2Rebuild options
OptionsSame, bigger, two-story, ADU
Same home. Bigger. Two stories. Plus an ADU.
In the Eaton Fire area, a like-for-like rebuild can grow by up to 200 sq ft or 10%, whichever is greater. A bigger home follows current zoning.

Like-for-like rebuild
Same size and place, up to 200 sq ft or 10% bigger.

Rebuild bigger
A larger home under current zoning.

Two-story home
Build up and keep your yard.

Home + detached ADU
Both planned, permitted and built together.

ADU first
Live in the ADU while the house goes up.
A3Finished homes
FinishedReal Beaver homes
See how we finish a home.
Homes and kitchens we’ve finished in Los Angeles.
Real Beaver homes and kitchens, built by the same in-house team that is rebuilding in Altadena now. We draw your home and ADU together, pull the permit and build it.
Request a callA4Cost factors
From$450/sq ft home · $200/sq ft ADU
Fire rebuild cost in Altadena.
A rebuilt home in Altadena starts at $450 per sq ft, and an ADU starts at $200 per sq ft. Final price depends on your lot, size and finishes.
| Cost factor | What we review |
|---|---|
| Home size | Square footage, one or two stories. |
| The ADU | Detached, attached or junior, and its size. |
| Finishes | Floors, cabinets, tile and fixtures you choose. |
| Lot, plans and permits | Trees, slope, engineering and the County permit. |
A5In-house
CoversPlans, permits and the build
Everything in-house, in one place.
Beaver does the plans, permit and construction in-house. One team, from the first walk-through to the day you move back in.
The same team that draws the plans builds them.
On our Altadena rebuild we handled the County permit, the protected-tree review and the lender paperwork for the owner’s SBA loan. The owner lives far away and followed the build on Zoom and FaceTime.
1Walk-through and plans
We review the damage and our team draws the repair or rebuild plans.
2Permits
Our office prepares the plans and pulls the permit.
3Build
Our crew repairs or rebuilds your home.

A6Sequence
Case studyHome + ADU, Altadena
From the cleared lot to your front door.
Beaver walks the lot with you, draws the plans, pulls the County permit and builds with its own crew.
Altadena is unincorporated LA County, so rebuild permits go through the County, with a One-Stop Permit Center for fire-affected owners.
LA County lets you build a standalone ADU with your rebuild. Your household can live in it while the main house goes up, through January 7, 2030.
Related: ADU construction · custom homes and additions · kitchen remodeling · roof replacement · fire restoration in Los Angeles
A new home takes 9 to 14 months after the permit, depending on the city, the design and how complex the project is.
Source: LA County recovery FAQ · One-Stop Permit Centers
Case study: a home and ADU rebuild in Altadena.

1Cleared lot
Debris removal comes first; then plans and the County permit.

2Footings
Trenches for the house and the ADU, cut to the plans.

3Foundation
Rebar, plumbing and concrete for both buildings.

4Framing
Walls and roof framing on the new slabs.

5Roof and windows
Shingle roof on, windows in, the exterior going on.
The problems we solved on this rebuild.
- The permit
We handled the LA County plan check and had the permit in about 3.5 months.
- A protected tree
We designed the house and ADU around it, so the tree stays.
- The funding
The owner used an SBA loan. We prepared the documents the lender needed.
- An owner far away
We met in person three times. Everything else ran on Zoom, FaceTime, text and email.
A7Before you sign
Before you signChoosing a fire repair contractor
Don’t be this homeowner.
He went with the lowest bid and the friendliest salesman.
- Day 1. A handshake, a low price, and “we’ll start next month.”
- Month 3. The first surprise bill. Then another one.
- Month 6. The crew stops showing up. His calls go to voicemail.
- Month 9. The repair is still stalled behind a fence.
Don’t make that decision on a handshake.
Ask who designs it, who pulls the permit, and who still answers the phone when something goes wrong. At Beaver, it’s the same team from the first walk-through to move-in, and we’ve been doing it in Los Angeles since 2006.
Talk to Beaver before you sign
A8Call sheet
Call backFree, no obligation


