Skip to content
Beaver Development and Remodeling Request a call
01 / 04

SB 9 builder in Los Angeles. We built 8 homes on 2 lots.

Does your lot qualify for SB 9? Check it free. Two homes on your lot, ADUs, or a bigger project: our in-house team plans, permits and builds it.

Starting at$450/sq ftNew SB 9 homePlans + permitsDone in-house, not outsourcedFreeSB 9 lot check, no obligation

Final price depends on your lot, size and finishes.

Building in Los Angeles since 2006

Beaver’s SB 9 job in Northridge: 8 homes on 2 lots.
A0
Project address

Free, no sign-up. Enter an LA County address or parcel number (APN).

A1Site plan

ProjectSample lot until you search

Does my lot qualify for SB 9? Check it free.

Enter your address for a free SB9 lot check: lot size, zoning and recorded home size. Site and city review confirm what SB 9 allows on your lot.

SB 9 (often written SB9) lets you build two homes on a single-family lot in California, with or without splitting it. The main SB 9 requirements: the lot is in a single-family zone, and it is not excluded. Excluded lots include rent-controlled or recently rented homes and historic properties. In the City of Los Angeles, LADBS points owners to the SB 9 Eligibility Checklist on ZIMAS.

Beaver builds SB 9 projects for homeowners and investors in Los Angeles, from the lot check and plans to permits and construction.

Your free reportExample lot plan
Example lot plan showing the existing home, setbacks and a potential 45-by-25-foot ADU at the rear of the lot.
Your lot. Your potential ADU options.Lot outline · Possible placement · Items to confirmExample only. Site conditions and permit review determine what can be built.

General notes: your report includes

  1. Address & city. Your parcel and the city or county that handles permits.
  2. Lot & existing home. Lot square footage and recorded home size, where available.
  3. Zoning & ADU potential. Available zoning records and ADU options worth exploring.
  4. Size & possible placement. Size guidance, setbacks and a sample layout where maps allow.
  5. Property considerations. Available fire, flood, hillside, coastal and historic map flags.
  6. Your next steps. Starting-price examples and items to review with Beaver.

Coverage varies by city and available records. We confirm missing details and your property’s maximum buildable size through site and city review.

A2What you can build

OptionsTwo homes, split, ADUs

How many homes can I build with SB 9?

Without a lot split, SB 9 allows up to two homes on your lot, plus ADUs. With a lot split, each new lot can have two homes.

Can I build a second house on my property? On a single-family lot in Los Angeles, SB 9 often allows it, with or without an ADU. The free lot check is the first step.

SB 9 or ADU: which one, or both?

An ADU is a smaller second unit next to your home. SB 9 lets you build a second full home on the lot. On many lots you can do both: our Northridge job has SB 9 homes and ADUs on the same lots.

Two new homes on one Northridge lot, joined by a covered breezeway

SB 9 without a lot split

Two homes on your lot, plus ADUs.

Aerial view of two side-by-side lots with new homes under construction in Northridge

Split the lot

Two lots, up to two homes on each.

One-story ADU built next to new SB 9 homes in Northridge

Homes + ADUs

Add ADUs to the SB 9 homes.

Three new homes and a graded backyard on an SB 9 investor project in Northridge

Investor project

We plan the lot and build it for you.

Request a call

A3Plans

PlansDrawn by our team

We plan the lot for the most space.

Covered 10 by 10 foot breezeway connecting a main house to its ADU on an SB9 lot in Northridge

The breezeway: our solution in Northridge.

On our Northridge job we joined each main house to its ADU with a 10 by 10 ft breezeway. That let unused square footage from the house go to the ADU, so each one-story ADU is 3,600 sq ft.

Our own team draws the plans, finds the most homes and square footage the lot allows, and builds it.

Request a call

A4Cost

From$450/sq ft home · $200/sq ft ADU

How much does an SB 9 project cost in Los Angeles?

A new SB 9 home in Los Angeles starts at $450 per sq ft, and an ADU starts at $200 per sq ft. Final price depends on your lot, size and finishes.

What shapes your SB 9 estimate
Cost factorWhat we review
Number of homesTwo homes, a lot split, and any ADUs.
Home sizesSquare footage, one or two stories.
FinishesFloors, cabinets, tile and fixtures you choose.
Lot, plans and permitsDemolition, slope, utilities, engineering and permits.
Discuss my estimate

A5In-house

ClientsHomeowners to investment groups

From a single ADU to large developments. One team, one process.

Beaver works with homeowners, private investors, investment groups, institutional investors, hedge funds and overseas property owners, and alongside the banks and construction lenders that finance them.

Adding one ADU or managing several properties, you get the same team, the same systems and the same standards.

Northridge was 8 homes built at once, and it is one of many. We run several developments in parallel: we check the lot, draw the plans, coordinate engineering, pull the permits, set the budget and build to completion.

  1. 1One process

    Lot check, plans, engineering, permits, budget and construction, run by one Beaver team.

  2. 2Your project, visible

    With OneForeman, our construction management platform, you follow progress, review expenses and open documents from anywhere in the world.

  3. 3Built on relationships

    About 95% of our work comes from referrals and repeat clients. Many investors plan the next project with us while the current one is underway.

Request a call
Beaver’s in-house crew framing and roofing three SB 9 homes at once in Northridge

A6Sequence

Case study8 homes, Northridge

From the old house to eight new homes.

Beaver checks your lot, draws the plans, pulls the permits and builds with its own crew.

In the City of Los Angeles, a two-home SB 9 project goes to LADBS, and an SB 9 lot split goes to City Planning.

How long does SB 9 approval take?

Under state law, a complete SB 9 application must be approved or denied within 60 days.

The three-year owner-occupancy affidavit applies to an SB 9 lot split. Our Northridge job used SB 9 without a split.

Source: HCD SB 9 fact sheet · LADBS: SB 9

Drone view of all eight Beaver homes rising at once on two Northridge lots
Northridge: 8 homes on 2 lots, built at the same time by one Beaver team.

Case study: 8 homes on 2 lots in Northridge.

We partnered with an investor and built 8 homes for them in Northridge, all at the same time.

8 homesOn 2 side-by-side lots4,500 sq ftEach main house3,600 sq ftEach one-story ADUNo lot splitSB 9 by right
  1. Excavator demolishing an old house on the Northridge SB 9 lot

    1Demolition

    The old house comes down.

  2. Cleared and graded lot ready for eight new homes in Northridge

    2Cleared lot

    Both lots cleared and graded.

  3. Footings and foundations for a row of new SB 9 homes in Northridge

    3Foundations

    Footings for every home, poured together.

  4. Three framed homes with roof underlayment and scaffolding, the ADU row framed behind them

    4Framing and roof

    All homes framed at the same time.

  5. New SB 9 homes in Northridge with board-and-batten siding, shingle roofs and solar panels

    5Siding and roofs

    Siding, roofs and solar go on.

From demolition to finished homes: our Northridge SB 9 job, filmed by drone.

The problems we solved on this job.

  • More square footage

    A 10 by 10 ft breezeway joins each house to its ADU, so the ADU can use the square footage the house doesn’t.

  • Eight homes at once

    One in-house team ran both lots at the same time, from demolition to the finished homes.

  • The investor’s return

    We planned the lots for the most homes and square footage the rules allow.

  • No lot split

    We built under SB 9 by right, so the lots never had to be split.

Request a call

A7Before you sign

Before you signChoosing an SB 9 builder

Don’t be this homeowner.

He hired the lowest bid before anyone checked the lot.

  1. Day 1. A low bid, a handshake, and plans “we’ll sort out later.”
  2. Month 3. The plans come back from the city. Too big for the lot.
  3. Month 6. Redesign, new engineering, a second round of plan check.
  4. Month 9. Still no permit. The loan keeps running.

An SB 9 home starts around $450 per sq ft. Don’t make that decision on a handshake.

Ask who checks the lot, who designs it, who pulls the permits, and who still answers the phone when something goes wrong. At Beaver, it’s the same team from the lot check to the keys, and we’ve been doing it in Los Angeles since 2006.

Talk to Beaver before you sign
AI-generated illustration: stalled home build with bare foundations, rebar and open trenches on a dirt lot
A homeowner on the phone about his stalled project.

A8Call sheet

Call backFree, no obligation

Your SB 9 project starts with a conversation.

A homeowner with one lot, or an investor with several? Tell us about the lot and what you want to build.

Beaver has built in Los Angeles since 2006.

Fill in your info.

Leave your number. Our team will call to talk through your SB 9 project.

Your contact and project details
+ Add a note

By submitting, you ask Beaver to call about this project. Privacy Policy.

Free, no obligation. We call you back by the next business day.